Description
Custom built cementing unit: P/B 4 cylinder Ford gas w/5 spd trans. Hydraulic driven 2" Bowie pump. Hydraulic driven 3 x 4 centrifical pump. 2 mixing tanks (250 gal.)
Additional information
| Color | Blue |
|---|---|
| Location | Moab Utah |
Custom built cementing unit: P/B 4 cylinder Ford gas w/5 spd trans. Hydraulic driven 2" Bowie pump. Hydraulic driven 3 x 4 centrifical pump. 2 mixing tanks (250 gal.)
| Color | Blue |
|---|---|
| Location | Moab Utah |